MOWE – Nuclear Power Reactors 200 MW – Saudi Arabia - Project Profile

MOWE – Nuclear Power Reactors 200 MW – Saudi Arabia - Project Profile

Synopsis

"MOWE – Nuclear Power Reactors 200 MW – Saudi Arabia - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "MOWE – Nuclear Power Reactors 200 MW – Saudi Arabia - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

Saudi Arabia's Ministry of Water and Electricity (MOWE), through King Abdullah City for Atomic and Renewable Energy (KA-CARE), is planning to build two nuclear power reactors in Saudi Arabia.

The project involves the construction of a nuclear power plant comprising two nuclear reactors. It will include the construction of a powerhouse, a substation and related infrastructure and the installation of nuclear reactors, reactor coolant pumps, steam generators, transformers and safety and security systems and the laying of transmission lines.

Each nuclear reactor will be a SMART (System-integrated Modular Advanced Reactor), 330 MWt pressurised water reactor with integral steam generators and advanced safety features, designed by the Korea Atomic Energy Research Institute. The unit is designed for electricity generation up to 100 MWe.

On March 3, 2015, a memorandum of understanding (MoU) was signed between King Abdullah City for Atomic and Renewable Energy (KA-CARE) and Korea Atomic Energy Research Institute (KAERI).

On September 3, 2015, a new contract was signed between KA-CARE and KAERI which includes cooperation and joint construction in designing the core of a SMART reactor.

Feasibility study is underway and will be complete by 2018. Simultaneously, engineering design works are underway.

20% of engineering design works were completed by December 2016.

Scope

The project involves the construction of two nuclear power reactors, each with a power generation capacity of 100MW, in Saudi Arabia.

The US$2,000 million project includes the following:

1. Construction of a powerhouse

2. Construction of a substation

3. Installation of nuclear reactors

4. Installation of reactor coolant pumps

5. Installation of steam generators

6. Installation of transformers

7. Installation of safety and security systems

8. Laying of transmission lines

Reasons To Buy

  • Gain insight into the project.
  • Monitor the latest project developments.
  • Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook

Share this report