Market Research Logo

MoTMC – Grand Istanbul Tunnel – Turkey - Project Profile

MoTMC – Grand Istanbul Tunnel – Turkey - Project Profile

Synopsis

"MoTMC – Grand Istanbul Tunnel – Turkey - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "MoTMC – Grand Istanbul Tunnel – Turkey - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

The Ministry of Transport, Maritime and Communications (MoTMC), Turkey, is planning to construct the Grand Istanbul Tunnel project in Turkey.

The project involves the construction of a three-level, 6.5km road and rail tunnel with a diameter of 16.8m. The railway level of the tunnel will be equipped with automatic signaling and auto-deceleration and acceleration systems.

The tunnel will be built 110m from the sea surface and the depth of the sea where it crosses the Bosporus will be 60-65m.

It also includes the construction of two road carriageways positioned above and below the railway line and related infrastructure, the installation of signalling and ventilation systems, fire fighting equipment, smoke extinguishers, traffic signals, led lights and CCTV equipment.

The project will be developed on public-private-partnership (PPP) mode on build-operate-transfer (BOT) basis.

A study has been carried for a period of 10 months since 2014. and MoTMC unveiled detail plans on February 27, 2015.

On June 19, 2015, Istanbul Metropolitan Municipality (IMM) approved the development.

On December 22, 2015, MoTMC issued tender for the procurement of consultant to provide research, project and engineering services. However, the tenders were cancelled in October 2016

The engineering studies would be conducted on land, sea and estuary drilling, and includes geophysical, geotechnical and geological conditions, routes and preliminary and final feasibility surveys to determine ground data.

MoTMC is planning to reissue tenders to appoint a consultant, which is expected by the end of December 2016. Subject to further planning and engineering.

In February 2017, Four companies submitted financial proposal tender bids for the survey, project, and engineering. Four companies are Tecnimont Civil Construction SPA, Italfer SPA - Sintagma Srl Joint Venture, Arcadis - Prota Engineering Project Consultancy Services Inc. Joint Venture and Yüksel Proje Uluslararasi AS.

In April 2017, MoTC appointed Yuksel Project International Inc. as the design, engineering and consultancy services contract.

Planning activities are underway and construction activities are scheduled for completion by 2023.

Scope

The project involves the construction of a three-level, 6.5km road and rail tunnel with a diameter of 16.8m in Istanbul, Turkey.

The US$3,500 million project includes the following:

1. Construction of two road carriageways positioned above and below the railway line

2. Installation of signaling systems and lights

3. Installation of ventilation systems

4. Installation of firefighting equipment

5. Installation of smoke extinguishers and CCTV equipment

Reasons To Buy

  • Gain insight into the project.
  • Monitor the latest project developments.
  • Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook

Share this report