
Rail Infrastructure Construction Market in Latvia - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)
Description
Rail Infrastructure Construction Market in Latvia - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)
Summary
The rail infrastructure construction sector in Latvia registered a positive Compound Annual Growth Rate (CAGR) of 10.53% during the period 2017 to 2021 with an output value of LVL111.28 million in 2021, an increase of7.78% over 2020. The sector achieved its strongest performance in 2017 when it grew by 91.12% over the previous year and its weakest performance in 2020, when it decreased by 7.85% over 2019.
Rail Infrastructure Construction Market in Latvia - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Rail Infrastructure construction market in Latvia.
Facilities that serve the railway system. This includes, but is not limited to, rail bridges, railway stations, terminals, rail buildings, rail tunnels and rail tracks. .
This research handbook provides historic and forecast market data for the Rail Infrastructure construction market in Latvia, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026.
This report also provides a top-level overview and detailed insight into the operating environment of the Rail Infrastructure construction market in Latvia. It is an essential tool for companies active across the Latvia construction value chain and for new players considering to enter the market.
Values in the handbook are depicted in USD ($) and local currency of the country.
*Note:Certain content / sections in the research handbook may be removed or altered based on the availability and relevance of data.
Scope
- Overview of the rail infrastructure construction market in Latvia.
- Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided.
- A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the rail infrastructure market and the data is provided for both historic and forecast periods.
- Enhances your knowledge of the market with key figures detailing construction type.
- Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
- Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
- Allows you to plan future business decisions using the forecast figures given.
- The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.
Table of Contents
41 Pages
- 1 Executive Summary
- 2 Rail Infrastructure Construction: Market Analytics
- 2.1 Rail Infrastructure Construction Output Value, 2017 - 2021
- 2.2 Rail Infrastructure Construction Output Value Forecast, 2021 - 2026
- 2.3 Rail Infrastructure Construction Output, by Cost Component
- 2.3.1 Rail Infrastructure Construction Output, by Cost Component, 2017 - 2021
- 2.3.2 Rail Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
- 3 Rail Infrastructure Construction Output: Analysis by Construction Type
- 3.1 New Construction Output Value, 2017 - 2021
- 3.2 New Construction Output Value Forecast, 2021 - 2026
- 3.3 New Construction Output Value by Cost Component
- 3.3.1 New Construction Output, by Cost Component, 2017 - 2021
- 3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
- 3.4 Repair and Maintenance Output Value, 2017 - 2021
- 3.5 Repair and Maintenance Output value Forecast, 2021- 2026
- 3.6 Repair and Maintenance Output, by Cost Component
- 3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
- 3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
- 3.7 Refurbishment Construction Output Value, 2017 – 2021
- 3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
- 3.9 Refurbishment Construction Output, by Cost Component
- 3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
- 3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
- 3.1 Demolition Construction Output Value, 2017 - 2021
- 3.11 Demolition Construction Output Value Forecast, 2021- 2026
- 3.12 Demolition Construction Output, by Cost Component
- 3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
- 3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
- 4 Appendix
- 4.1 Definitions
- 4.2 CAGR Definition and Calculation
- 4.3 Exchange Rates
- 4.4 Methodology
- 4.5 About GlobalData
- 4.6 Disclaimer
- List of Tables
- Table 1: Latvia Rail Infrastructure Construction Output Value (LVL Million), 2017 - 2021
- Table 2: Latvia Rail Infrastructure Construction Output Value (US$ Million), 2017 - 2021
- Table 3: Latvia Rail Infrastructure Construction Output Value (LVL Million), 2021 - 2026
- Table 4: Latvia Rail Infrastructure Construction Output Value (US$ Million), 2021 - 2026
- Table 5: Latvia Rail Infrastructure Construction Output, by Cost Component (LVL Million), 2017 – 2021
- Table 6: Latvia Rail Infrastructure Construction Output, by Cost Component (US$ Million), 2017 – 2021
- Table 7: Latvia Rail Infrastructure Construction Output, by Cost Component (LVL Million), 2022 - 2026
- Table 8: Latvia Rail Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
- Table 9: Latvia Rail Infrastructure Construction Output Value, New Construction (LVL Million), 2017 - 2021
- Table 10: Latvia Rail Infrastructure Construction Output Value, New Construction (US$ Million), 2017 - 2021
- Table 11: Latvia Rail Infrastructure Construction Output Value, New Construction (LVL Million), 2021- 2026
- Table 12: Latvia Rail Infrastructure Construction Output Value, New Construction (US$ Million), 2021- 2026
- Table 13: Latvia Rail Infrastructure Construction Output, New Construction by Cost Component (LVL Million), 2017 - 2021
- Table 14: Latvia Rail Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2017 - 2021
- Table 15: Latvia Rail Infrastructure Construction Output, New Construction by Cost Component (LVL Million), 2022 - 2026
- Table 16: Latvia Rail Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2022 - 2026
- Table 17: Latvia Rail Infrastructure Construction Output Value, Repair and Maintenance (LVL Million), 2017 - 2021
- Table 18: Latvia Rail Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2017 - 2021
- Table 19: Latvia Rail Infrastructure Construction Output Value, Repair and Maintenance (LVL Million), 2021 – 2026
- Table 20: Latvia Rail Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2021 - 2026
- Table 21: Latvia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (LVL Million), 2017 - 2021
- Table 22: Latvia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2017 - 2021
- Table 23: Latvia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (LVL Million), 2022 – 2026
- Table 24: Latvia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2022 – 2026
- Table 25: Latvia Rail Infrastructure Construction Output Value, Refurbishment (LVL Million), 2017 - 2021
- Table 26: Latvia Rail Infrastructure Construction Output Value, Refurbishment (US$ Million), 2017 - 2021
- Table 27: Latvia Rail Infrastructure Construction Output Value, Refurbishment (LVL Million), 2021 - 2026
- Table 28: Latvia Rail Infrastructure Construction Output Value, Refurbishment (US$ Million), 2021- 2026
- Table 29: Latvia Rail Infrastructure Construction Output, Refurbishment by Cost Component (LVL Million), 2017 - 2021
- Table 30: Latvia Rail Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2017 - 2021
- Table 31: Latvia Rail Infrastructure Construction Output, Refurbishment by Cost Component (LVL Million), 2022 - 2026
- Table 32: Latvia Rail Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2022 - 2026
- Table 33: Latvia Rail Infrastructure Construction Output Value, Demolition (LVL Million), 2017 - 2021
- Table 34: Latvia Rail Infrastructure Construction Output Value, Demolition (US$ Million), 2017 - 2021
- Table 35: Latvia Rail Infrastructure Construction Output Value, Demolition (LVL Million), 2021 - 2026
- Table 36: Latvia Rail Infrastructure Construction Output Value, Demolition (US$ Million), 2021 - 2026
- Table 37: Latvia Rail Infrastructure Construction Output, Demolition by Cost Component (LVL Million), 2017 - 2021
- Table 38: Latvia Rail Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2017 - 2021
- Table 39: Latvia Rail Infrastructure Construction Output, Demolition by Cost Component (LVL Million), 2022 - 2026
- Table 40: Latvia Rail Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2022 - 2026
- Table 41: GlobalData – Rail Infrastructure Construction Market Definitions
- Table 42: Exchange Rate, 2017 - 2021
- Table 43: Exchange Rate, 2022 - 2026 Forecast
- List of Figures
- Figure 1: Latvia Rail Infrastructure Construction Output Value (LVL Million), 2017 – 2021
- Figure 2: Latvia Rail Infrastructure Construction Output Value (LVL Million), 2021 – 2026
- Figure 3: Latvia Rail Infrastructure Construction Output, by Cost Component (LVL Million), 2017 - 2021
- Figure 4: Latvia Rail Infrastructure Construction Output, by Cost Component (LVL Million), 2022 - 2026
- Figure 5: Latvia Rail Infrastructure Construction Output Value, New Construction (LVL Million), 2017 - 2021
- Figure 6: Latvia Rail Infrastructure Construction Output Value, New Construction (LVL Million), 2021 - 2026
- Figure 7: Latvia Rail Infrastructure Construction Output, New Construction by Cost Component (LVL Million), 2017 - 2021
- Figure 8: Latvia Rail Infrastructure Construction Output, New Construction by Cost Component (LVL Million), 2022 - 2026
- Figure 9: Latvia Rail Infrastructure Construction Output Value, Repair and Maintenance (LVL Million), 2017 - 2021
- Figure 10: Latvia Rail Infrastructure Construction Output Value, Repair and Maintenance (LVL Million), 2021- 2026
- Figure 11: Latvia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (LVL Million), 2017 - 2021
- Figure 12: Latvia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (LVL Million), 2022 – 2026
- Figure 13: Latvia Rail Infrastructure Construction Output Value, Refurbishment (LVL Million), 2017 - 2021
- Figure 14: Latvia Rail Infrastructure Construction Output Value, Refurbishment (LVL Million), 2021- 2026
- Figure 15: Latvia Rail Infrastructure Construction Output, Refurbishment by Cost Component (LVL Million), 2017 - 2021
- Figure 16: Latvia Rail Infrastructure Construction Output, Refurbishment by Cost Component (LVL Million), 2022 - 2026
- Figure 17: Latvia Rail Infrastructure Construction Output Value, Demolition (LVL Million), 2017 - 2021
- Figure 18: Latvia Rail Infrastructure Construction Output Value, Demolition (LVL Million), 2021 - 2026
- Figure 19: Latvia Rail Infrastructure Construction Output, Demolition by Cost Component (LVL Million), 2017 - 2021
- Figure 20: Latvia Rail Infrastructure Construction Output, Demolition by Cost Component (LVL Million), 2022 - 2026
Pricing
Currency Rates
Questions or Comments?
Our team has the ability to search within reports to verify it suits your needs. We can also help maximize your budget by finding sections of reports you can purchase.