Sewage Infrastructure (Construction) in Bolivia: Market Analytics by Category & Cost Type to 2021
Synopsis
Timetric’s "Sewage Infrastructure (Construction) in Bolivia: Market Analytics by Category & Cost Type to 2021" contains historic and forecast market data for the sewage infrastructure category in Bolivia, it also provides detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services).
Summary
The construction of facilities that collect and treat waste and sewage is categorized under the sewage infrastructure category. It includes, but is not limited to, drainage systems, septic tanks, sewer pipes & pumping stations, disposal plants and treatment facilities.
The Bolivian sewage infrastructure construction category continued to increase in the review period with a value of BOBxxx.xx million (US$xxx.xx million) in 2016 and increased at a rate of xx.xx% over 2015. The market recorded a CAGR of xx.xx% from 2012 through 2016."Sewage Infrastructure (Construction) in Bolivia: Market Analytics by Category & Cost Type to 2021"' provides a top-level overview and detailed insight into the operating environment of the sewage infrastructure market in Bolivia. It is an essential tool for companies active across the Bolivia construction value chain and for new players considering to enter the market.
Scope
- A top level overview of the sewage infrastructure construction category in Bolivia.
- Historic data provided from 2012 through 2016 and forecast from 2017 through 2021.
- A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment & construction services) across the sewage infrastructure market.
Reasons To Buy- Provides a top level understanding of the Sewage Infrastructure construction in Bolivia.
- Helps you understand the market performance by construction activity (new construction, repair and maintenance, refurbishment and demolition) and construction cost type (construction materials, construction equipment & construction services).
- Allows you to plan future business decisions using the forecast figures given.
- The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.
- 1 Introduction
- 1.1 What is this Report About?
- 1.2 Definitions
- 1.3 CAGR Definition and Calculation
- 2 Overall Sewage Infrastructure construction: Market Analysis
- 2.1 Overall Sewage Infrastructure construction Output Value, 2012 - 2016
- 2.2 Overall Sewage Infrastructure construction Output Value Forecast, 2017 - 2021
- 2.3 Overall Sewage Infrastructure construction Output, by Cost Type
- 2.3.1 Overall Sewage Infrastructure construction Output, by Cost Type, 2012 - 2016
- 2.3.2 Overall Sewage Infrastructure construction Output Forecast, by Cost Type, 2017 - 2021
- 3 Sewage Infrastructure construction Output: Analysis by Category
- 3.1 New Construction Output Value, 2012 - 2016
- 3.2 New Construction Output Value Forecast, 2017 - 2021
- 3.3 New Construction Output Value by Cost Type
- 3.3.1 New Construction Output, by Cost type, 2012 - 2016
- 3.3.2 New Construction Output Forecast, by Cost Type, 2017 - 2021
- 3.4 Repair & Maintenance Output Value, 2012 - 2016
- 3.5 Repair & Maintenance Output value Forecast, 2017 - 2021
- 3.6 Repair & Maintenance Output, by Cost Type
- 3.6.1 Repair & Maintenance Output, by Cost type, 2012 - 2016
- 3.6.2 Repair & Maintenance Output Forecast, by Cost Type, 2017 - 2021
- 3.7 Refurbishment Construction Output Value, 2012 - 2016
- 3.8 Refurbishment Construction Output Value Forecast, 2017 - 2021
- 3.9 Refurbishment Construction Output, by Cost Type
- 3.9.1 Refurbishment Construction Output, by Cost type, 2012 - 2016
- 3.9.2 Refurbishment Construction Output Forecast, by Cost type, 2017 - 2021
- 3.1 Demolition Construction Output Value, 2012 - 2016
- 3.11 Demolition Construction Output Value Forecast, 2017 - 2021
- 3.12 Demolition Construction Output, by Cost Type
- 3.12.1 Demolition Construction Output, by Cost type, 2012 - 2016
- 3.12.2 Demolition Construction Output Forecast, by Cost type, 2017 - 2021
- 4 Appendix
- 4.1 Summary Methodology
- 4.2 Exchange Rates
- 4.3 About Timetric
- 4.4 Timetric’s Services
- 4.5 Disclaimer
- List of Tables
- Table 1: Timetric- Sewage Infrastructure construction Market Definitions
- Table 2: Bolivian Overall Sewage Infrastructure construction Output Value (US$ Million), 2012 - 2016
- Table 3: Bolivian Overall Sewage Infrastructure construction Output Value (BOB Million), 2012 - 2016
- Table 4: Bolivian Overall Sewage Infrastructure construction Output Value (US$ Million), 2017 - 2021
- Table 5: Bolivian Overall Sewage Infrastructure construction Output Value (BOB Million), 2017 - 2021
- Table 6: Bolivian Overall Sewage Infrastructure construction Output, by Cost Type (US$ Million), 2012 - 2016
- Table 7: Bolivian Overall Sewage Infrastructure construction Output, by Cost Type (BOB Million), 2012 - 2016
- Table 8: Bolivian Overall Sewage Infrastructure construction Output, by Cost Type (US$ Million), 2017 - 2021
- Table 9: Bolivian Overall Sewage Infrastructure construction Output, by Cost Type (BOB Million), 2017 - 2021
- Table 10: Bolivian Sewage Infrastructure construction Output Value, New Construction (US$ Million), 2012 - 2016
- Table 11: Bolivian Sewage Infrastructure construction Output Value, New Construction (BOB Million), 2012 - 2016
- Table 12: Bolivian Sewage Infrastructure construction Output Value, New Construction (US$ Million), 2017 - 2021
- Table 13: Bolivian Sewage Infrastructure construction Output Value, New Construction (BOB Million), 2017 - 2021
- Table 14: Bolivian Sewage Infrastructure construction Output, New Construction by Cost Type (US$ Million), 2012 - 2016
- Table 15: Bolivian Sewage Infrastructure construction Output, New Construction by Cost Type (BOB Million), 2012 - 2016
- Table 16: Bolivian Sewage Infrastructure construction Output, New Construction by Cost Type (US$ Million), 2017 - 2021
- Table 17: Bolivian Sewage Infrastructure construction Output, New Construction by Cost Type (BOB Million), 2017 - 2021
- Table 18: Bolivian Sewage Infrastructure construction Output Value, Repair & Maintenance (US$ Million), 2012 - 2016
- Table 19: Bolivian Sewage Infrastructure construction Output Value, Repair & Maintenance (BOB Million), 2012 - 2016
- Table 20: Bolivian Sewage Infrastructure construction Output Value, Repair & Maintenance (US$ Million), 2017 - 2021
- Table 21: Bolivian Sewage Infrastructure construction Output Value, Repair & Maintenance (BOB Million), 2017 - 2021
- Table 22: Bolivian Sewage Infrastructure construction Output, Repair & Maintenance by Cost Type(US$ Million), 2012 - 2016
- Table 23: Bolivian Sewage Infrastructure construction Output, Repair & Maintenance by Cost Type (BOB Million), 2012 - 2016
- Table 24: Bolivian Sewage Infrastructure construction Output, Repair & Maintenance by Cost Type (US$ Million), 2017 - 2021
- Table 25: Bolivian Sewage Infrastructure construction Output, Repair & Maintenance by Cost Type (BOB Million), 2017 - 2021
- Table 26: Bolivian Sewage Infrastructure construction Output Value, Refurbishment (US$ Million), 2012 - 2016
- Table 27: Bolivian Sewage Infrastructure construction Output Value, Refurbishment (BOB Million), 2012 - 2016
- Table 28: Bolivian Sewage Infrastructure construction Output Value, Refurbishment (US$ Million), 2017 - 2021
- Table 29: Bolivian Sewage Infrastructure construction Output Value, Refurbishment (BOB Million), 2017 - 2021
- Table 30: Bolivian Sewage Infrastructure construction Output, Refurbishment by Cost Type (US$ Million), 2012 - 2016
- Table 31: Bolivian Sewage Infrastructure construction Output, Refurbishment by Cost Type (BOB Million), 2012 - 2016
- Table 32: Bolivian Sewage Infrastructure construction Output, Refurbishment by Cost Type (US$ Million), 2017 - 2021
- Table 33: Bolivian Sewage Infrastructure construction Output, Refurbishment by Cost Type (BOB Million), 2017 - 2021
- Table 34: Bolivian Sewage Infrastructure construction Output Value, Demolition (US$ Million), 2012 - 2016
- Table 35: Bolivian Sewage Infrastructure construction Output Value, Demolition (BOB Million), 2012 - 2016
- Table 36: Bolivian Sewage Infrastructure construction Output Value, Demolition (US$ Million), 2017 - 2021
- Table 37: Bolivian Sewage Infrastructure construction Output Value, Demolition (BOB Million), 2017 - 2021
- Table 38: Bolivian Sewage Infrastructure construction Output, Demolition by Cost Type (US$ Million), 2012 - 2016
- Table 39: Bolivian Sewage Infrastructure construction Output, Demolition by Cost Type (BOB Million), 2012 - 2016
- Table 40: Bolivian Sewage Infrastructure construction Output, Demolition by Cost Type (US$ Million), 2017 - 2021
- Table 41: Bolivian Sewage Infrastructure construction Output, Demolition by Cost Type (BOB Million), 2017 - 2021
- Table 42: Exchange Rate (Annual Average), 2012 – 2016
- Table 43: Exchange Rate (Annual Average), 2017 – 2021 Forecast
- List of Figures
- Figure 1: Bolivian Overall Sewage Infrastructure construction Output Value (BOB Million), 2012 - 2016
- Figure 2: Bolivian Overall Sewage Infrastructure construction Output Value (BOB Million), 2017 - 2021
- Figure 3: Bolivian Overall Sewage Infrastructure construction Output, by Cost Type (BOB Million), 2012 - 2016
- Figure 4: Bolivian Overall Sewage Infrastructure construction Output, by Cost Type (BOB Million), 2017 - 2021
- Figure 5: Bolivian Sewage Infrastructure construction Output Value, New Construction (BOB Million), 2012 - 2016
- Figure 6: Bolivian Sewage Infrastructure construction Output Value, New Construction (BOB Million), 2017 - 2021
- Figure 7: Bolivian Sewage Infrastructure construction Output, New Construction by Cost Type (BOB Million), 2012 - 2016
- Figure 8: Bolivian Sewage Infrastructure construction Output, New Construction by Cost Type (BOB Million), 2017 - 2021
- Figure 9: Bolivian Sewage Infrastructure construction Output Value, Repair & Maintenance (BOB Million), 2012 - 2016
- Figure 10: Bolivian Sewage Infrastructure construction Output Value, Repair & Maintenance (BOB Million), 2017 - 2021
- Figure 11: Bolivian Sewage Infrastructure construction Output, Repair & Maintenance by Cost Type (BOB Million), 2012 - 2016
- Figure 12: Bolivian Sewage Infrastructure construction Output, Repair & Maintenance by Cost Type (BOB Million), 2017 - 2021
- Figure 13: Bolivian Sewage Infrastructure construction Output Value, Refurbishment (BOB Million), 2012 - 2016
- Figure 14: Bolivian Sewage Infrastructure construction Output Value, Refurbishment (BOB Million), 2017 - 2021
- Figure 15: Bolivian Sewage Infrastructure construction Output, Refurbishment by Cost Type (BOB Million), 2012 - 2016
- Figure 16: Bolivian Sewage Infrastructure construction Output, Refurbishment by Cost Type (BOB Million), 2017 - 2021
- Figure 17: Bolivian Sewage Infrastructure construction Output Value, Demolition (BOB Million), 2012 - 2016
- Figure 18: Bolivian Sewage Infrastructure construction Output Value, Demolition (BOB Million), 2017 - 2021
- Figure 19: Bolivian Sewage Infrastructure construction Output, Demolition by Cost Type (BOB Million), 2012 - 2016
- Figure 20: Bolivian Sewage Infrastructure construction Output, Demolition by Cost Type (BOB Million), 2017 - 2021