Electricity and Power Construction Market in Cambodia - Market Size and Forecasts to 2025 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)
Summary
The electricity and power construction sector in Cambodia registered a positive Compound Annual Growth Rate (CAGR) of 16.95% during the period 2016 to 2020 with an output value of KHR2,729,133.89 million in 2020, a decrease of 3.02% over 2019. The sector achieved its strongest performance in 2016 when it grew by 27.36% over the previous year and its weakest performance in 2020, when it decreased by 3.02% over 2019.
Latest Research Report, the Electricity and Power Construction Market in Cambodia - Market Size and Forecasts to 2025 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Electricity and Power construction market in Cambodia
The report depicts Electricity and Power as Buildings for power generation and transmission, and electrical transmission infrastructure including the laying and installation of cables, pipes and transmitting towers.
This research handbook provides historic and forecast market data for the Electricity and Power construction market in Cambodia, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2016-2020 and an illustrative forecast to 2025.
It also provides a top-level overview and detailed insight into the operating environment of the Electricity and Power construction market in Cambodia. It is an essential tool for companies active across the Cambodia construction value chain and for new players considering to enter the market
Values in the handbook are depicted in USD ($) and local currency of the country
*Note: Certain content / sections in the research handbook may be removed or altered based on the availability and relevance of data.
Scope
- Overview of the electricity and power construction market in Cambodia.
- Historic (2016 through 2020) and forecast (2021 through 2025) construction market output values are provided.
- A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the electricity and power market and the data is provided for both historic and forecast periods.
Reasons to Buy- Enhances your knowledge of the market with key figures detailing construction type.
- Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
- Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
- Allows you to plan future business decisions using the forecast figures given.
- The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.
- 1 Executive Summary
- 2 Electricity and Power Construction: Market Analytics
- 2.1 Electricity and Power Construction Output Value, 2016 - 2020
- 2.2 Electricity and Power Construction Output Value Forecast, 2020 - 2025
- 2.3 Electricity and Power Construction Output, by Cost Component
- 2.3.1 Electricity and Power Construction Output, by Cost Component, 2016 - 2020
- 2.3.2 Electricity and Power Construction Output Forecast, by Cost Component, 2021 - 2025
- 3 Electricity and Power Construction Output: Analysis by Construction Type
- 3.1 New Construction Output Value, 2016 - 2020
- 3.2 New Construction Output Value Forecast, 2020 - 2025
- 3.3 New Construction Output Value by Cost Component
- 3.3.1 New Construction Output, by Cost Component, 2016 - 2020
- 3.3.2 New Construction Output Forecast, by Cost Component, 2021 - 2025
- 3.4 Repair and Maintenance Output Value, 2016 - 2020
- 3.5 Repair and Maintenance Output value Forecast, 2020- 2025
- 3.6 Repair and Maintenance Output, by Cost Component
- 3.6.1 Repair and Maintenance Output, by Cost Component, 2016 - 2020
- 3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2021 - 2025
- 3.7 Refurbishment Construction Output Value, 2016 - 2020
- 3.8 Refurbishment Construction Output Value Forecast, 2020- 2025
- 3.9 Refurbishment Construction Output, by Cost Component
- 3.9.1 Refurbishment Construction Output, by Cost Component, 2016 - 2020
- 3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2021 - 2025
- 3.10 Demolition Construction Output Value, 2016 - 2020
- 3.11 Demolition Construction Output Value Forecast, 2020- 2025
- 3.12 Demolition Construction Output, by Cost Component
- 3.12.1 Demolition Construction Output, by Cost Component, 2016 - 2020
- 3.12.2 Demolition Construction Output Forecast, by Cost Component, 2021 - 2025
- 4 Appendix
- 4.1 Definitions
- 4.2 CAGR Definition and Calculation
- 4.3 Exchange Rates
- 4.4 Methodology
- 4.5 About GlobalData
- 4.6 Disclaimer
- List of Tables
- Table 1: Cambodia Electricity and Power Construction Output Value (KHR Million), 2016 - 2020
- Table 2: Cambodia Electricity and Power Construction Output Value (US$ Million), 2016 - 2020
- Table 3: Cambodia Electricity and Power Construction Output Value (KHR Million), 2020 - 2025
- Table 4: Cambodia Electricity and Power Construction Output Value (US$ Million), 2020 - 2025
- Table 5: Cambodia Electricity and Power Construction Output, by Cost Component (KHR Million), 2016 - 2020
- Table 6: Cambodia Electricity and Power Construction Output, by Cost Component (US$ Million), 2016 - 2020
- Table 7: Cambodia Electricity and Power Construction Output, by Cost Component (KHR Million), 2021 - 2025
- Table 8: Cambodia Electricity and Power Construction Output, by Cost Component (US$ Million), 2021 - 2025
- Table 9: Cambodia Electricity and Power Construction Output Value, New Construction (KHR Million), 2016 - 2020
- Table 10: Cambodia Electricity and Power Construction Output Value, New Construction (US$ Million), 2016 - 2020
- Table 11: Cambodia Electricity and Power Construction Output Value, New Construction (KHR Million), 2020- 2025
- Table 12: Cambodia Electricity and Power Construction Output Value, New Construction (US$ Million), 2020- 2025
- Table 13: Cambodia Electricity and Power Construction Output, New Construction by Cost Component (KHR Million), 2016 - 2020
- Table 14: Cambodia Electricity and Power Construction Output, New Construction by Cost Component (US$ Million), 2016 - 2020
- Table 15: Cambodia Electricity and Power Construction Output, New Construction by Cost Component (KHR Million), 2021 - 2025
- Table 16: Cambodia Electricity and Power Construction Output, New Construction by Cost Component (US$ Million), 2021 - 2025
- Table 17: Cambodia Electricity and Power Construction Output Value, Repair and Maintenance (KHR Million), 2016 - 2020
- Table 18: Cambodia Electricity and Power Construction Output Value, Repair and Maintenance (US$ Million), 2016 - 2020
- Table 19: Cambodia Electricity and Power Construction Output Value, Repair and Maintenance (KHR Million), 2020 - 2025
- Table 20: Cambodia Electricity and Power Construction Output Value, Repair and Maintenance (US$ Million), 2020 - 2025
- Table 21: Cambodia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (KHR Million), 2016 - 2020
- Table 22: Cambodia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2016 - 2020
- Table 23: Cambodia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (KHR Million), 2021 - 2025
- Table 24: Cambodia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2021 - 2025
- Table 25: Cambodia Electricity and Power Construction Output Value, Refurbishment (KHR Million), 2016 - 2020
- Table 26: Cambodia Electricity and Power Construction Output Value, Refurbishment (US$ Million), 2016 - 2020
- Table 27: Cambodia Electricity and Power Construction Output Value, Refurbishment (KHR Million), 2020 - 2025
- Table 28: Cambodia Electricity and Power Construction Output Value, Refurbishment (US$ Million), 2020- 2025
- Table 29: Cambodia Electricity and Power Construction Output, Refurbishment by Cost Component (KHR Million), 2016 - 2020
- Table 30: Cambodia Electricity and Power Construction Output, Refurbishment by Cost Component (US$ Million), 2016 - 2020
- Table 31: Cambodia Electricity and Power Construction Output, Refurbishment by Cost Component (KHR Million), 2021 - 2025
- Table 32: Cambodia Electricity and Power Construction Output, Refurbishment by Cost Component (US$ Million), 2021 - 2025
- Table 33: Cambodia Electricity and Power Construction Output Value, Demolition (KHR Million), 2016 - 2020
- Table 34: Cambodia Electricity and Power Construction Output Value, Demolition (US$ Million), 2016 - 2020
- Table 35: Cambodia Electricity and Power Construction Output Value, Demolition (KHR Million), 2020 - 2025
- Table 36: Cambodia Electricity and Power Construction Output Value, Demolition (US$ Million), 2020 - 2025
- Table 37: Cambodia Electricity and Power Construction Output, Demolition by Cost Component (KHR Million), 2016 - 2020
- Table 38: Cambodia Electricity and Power Construction Output, Demolition by Cost Component (US$ Million), 2016 - 2020
- Table 39: Cambodia Electricity and Power Construction Output, Demolition by Cost Component (KHR Million), 2021 - 2025
- Table 40: Cambodia Electricity and Power Construction Output, Demolition by Cost Component (US$ Million), 2021 - 2025
- Table 41: GlobalData - Electricity and Power Construction Market Definitions
- Table 42: Exchange Rate, 2016 - 2020
- Table 43: Exchange Rate, 2021 - 2025 Forecast
- List of Figures
- Figure 1: Cambodia Electricity and Power Construction Output Value (KHR Million), 2016 - 2020
- Figure 2: Cambodia Electricity and Power Construction Output Value (KHR Million), 2020 - 2025
- Figure 3: Cambodia Electricity and Power Construction Output, by Cost Component (KHR Million), 2016 - 2020
- Figure 4: Cambodia Electricity and Power Construction Output, by Cost Component (KHR Million), 2021 - 2025
- Figure 5: Cambodia Electricity and Power Construction Output Value, New Construction (KHR Million), 2016 - 2020
- Figure 6: Cambodia Electricity and Power Construction Output Value, New Construction (KHR Million), 2020 - 2025
- Figure 7: Cambodia Electricity and Power Construction Output, New Construction by Cost Component (KHR Million), 2016 - 2020
- Figure 8: Cambodia Electricity and Power Construction Output, New Construction by Cost Component (KHR Million), 2021 - 2025
- Figure 9: Cambodia Electricity and Power Construction Output Value, Repair and Maintenance (KHR Million), 2016 - 2020
- Figure 10: Cambodia Electricity and Power Construction Output Value, Repair and Maintenance (KHR Million), 2020- 2025
- Figure 11: Cambodia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (KHR Million), 2016 - 2020
- Figure 12: Cambodia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (KHR Million), 2021 - 2025
- Figure 13: Cambodia Electricity and Power Construction Output Value, Refurbishment (KHR Million), 2016 - 2020
- Figure 14: Cambodia Electricity and Power Construction Output Value, Refurbishment (KHR Million), 2020- 2025
- Figure 15: Cambodia Electricity and Power Construction Output, Refurbishment by Cost Component (KHR Million), 2016 - 2020
- Figure 16: Cambodia Electricity and Power Construction Output, Refurbishment by Cost Component (KHR Million), 2021 - 2025
- Figure 17: Cambodia Electricity and Power Construction Output Value, Demolition (KHR Million), 2016 - 2020
- Figure 18: Cambodia Electricity and Power Construction Output Value, Demolition (KHR Million), 2020 - 2025
- Figure 19: Cambodia Electricity and Power Construction Output, Demolition by Cost Component (KHR Million), 2016 - 2020
- Figure 20: Cambodia Electricity and Power Construction Output, Demolition by Cost Component (KHR Million), 2021 - 2025