Market Research Logo

Total/Dong/SSE – Edradour Gas Field Development – UK - Project Profile

Total/Dong/SSE – Edradour Gas Field Development – UK - Project Profile

Synopsis

"Total/Dong/SSE – Edradour Gas Field Development – UK - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "Total/Dong/SSE – Edradour Gas Field Development – UK - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

Total S.A (Total), DONG E&P (UK) Ltd (Dong) and SSE E&P UK Ltd (SSE) are jointly undertaking the development of a gas field in the Shetland Islands, the UK.

The project involves the transformation of the exploratory well into a production well and the laying of a 16km production pipeline tied back to the main Laggan-Tormore flowline. The gas field will reach a plateau of 17,000 barrels of oil equivalent per day (boe/d).

Subsea works include the installation of a four-slot steel tube manifold, tie-back of the field to the In-Line Tee 3 (ILT3) tie-in point of the Laggan-Tormore production pipeline system with a 16km and 12 inch diameter production pipeline, a six-inch diameter monoethylene glycol (MEG) pipeline to prevent formation of hydrates during transportation and a two-inch diameter piggy-backed service pipeline.

The production flowline will be integrated with flowline end termination structures (FLETs) and a pipeline end manifold (PLEM) will be installed near ILT3. A 35km power, communications, hydraulic and chemical umbilical will also be installed from the Laggan manifold to the Edradour manifold.

In 2013, the project was put on hold due to significant cost increases, but subsequent negotiations with the contractors reduced the costs, allowing Total to revive the project in 2014.

In June 2013, Costain Group plc (formerly EPC Offshore Ltd) was appointed to provide project management services.

On July 4, 2014, Technip was appointed as the main contractor. The scope of work includes fabrication and installation of 12 inch production pipelines, 6-inch MEG (1) pipeline with 2-inch piggy backed service line, supply and installation of steel tube umbilical, fabrication and installation of pipeline end manifold, flowline end termination, flexible tails and rigid well tie-in spools, as well as the installation of templates and manifolds, rock dumping and pre-commissioning.

On October 16, 2014, FMC Technologies, Inc. received a contract from Total to supply subsea systems. The scope of supply consists of subsea equipment including manifolds and associated connections and controls equipment, wellhead systems, subsea tie back connection equipment and a subsea production tree.

On March 25, 2015, the Department of Energy and Climate Change approved Field Development Plans (FDPs).

Construction activities are underway and expected to be completed by fourth quarter of 2017.

Scope

The project involves the development of Edradour gas field located 75km north-west of the Shetland Islands, the UK.

The US$507 million project includes the following:

1. Development of gas fields

2. Installation of a four-slot steel tube manifold

3. Installation of 16km production pipeline

4. Installation of monoethylene glycol pipeline

5. Installation of piggy-backed service pipeline

6. Installation of 35km power, communications, hydraulic and chemical umbilical

7. Installation of templates and manifolds

8. Installation of safety and security systemsReasons To Buy

  • Gain insight into the project.
  • Monitor the latest project developments.
  • Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook

Share this report