SV – Stockholm Waste Water Treatment System Upgrade – Stockholm - Project Profile

SV – Stockholm Waste Water Treatment System Upgrade – Stockholm - Project Profile

Synopsis

"SV – Stockholm Waste Water Treatment System Upgrade – Stockholm - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "SV – Stockholm Waste Water Treatment System Upgrade – Stockholm - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

Stockholm Vatten AB (SV) is planning to undertake the upgrade of the city's Waste Water Treatment system in Stockholm, Sweden.

The project involves the upgrade of Henriksdalsringen Waste Water Treatment plant (WWTP) and the construction of a 15km sewage tunnel using drill and blast method from Bromma sewage treatment plant to Henriksdalsringen WWTP that will be 30-90m below ground level, a new pump station, new coarse screening and primary sedimentation basins, the installation of related machinery and safety equipment, the demolition of Bromma sewage treatment plant, and the laying of pipelines.

The sewage tunnel will be dug rather than drilled, both because of the soil conditions and that it will become cheaper.

Tyrens has been appointed as an environmental consultant, AF Group to deliver electrical solutions including telecommunications and automation systems.

In March 2015, General Electric (GE) was appointed as design and supply contractor. The scope of the contract includes the design and servicing of the entire membrane filtration package and supply of membrane bioreactor (MBR) equipment.

In June 2016, SV has signed a ten-year loan with Nordic Investment Bank (NIB).

As of June 2017, preparatory works are underway for the sewage tunnel and construction is scheduled to begin fourth quarter of 2017.

Construction works are expected to complete by 2024.

Scope

The project involves the construction of a sewage tunnel and upgrade to Henriksdalsringen WWTP in Stockholm, Sweden.

The US$813 million project includes the following:

1. Demolition of Bromma sewage treatment plant

2. Upgrade of existing Henriksdalsringen WWTP

3. Construction of a 15km sewage tunnel

4. Construction of a new pump station

5. Construction of new coarse screening and primary sedimentation basins

6. Installation of safety and security systems

7. Laying of pipelines

Reasons To Buy

  • Gain insight into the project.
  • Monitor the latest project developments.
  • Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Scope
6.Description
7.Latest update
8.Background
9.Key Contacts
10.General News, Project News
11.Appendix