SEW – Nyukcharong Chu Hydro Electric Power Plant 96 MW– Arunachal Pradesh - Project Profile

SEW – Nyukcharong Chu Hydro Electric Power Plant 96 MW– Arunachal Pradesh - Project Profile

Synopsis

"SEW – Nyukcharong Chu Hydro Electric Power Plant 96 MW– Arunachal Pradesh - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "SEW – Nyukcharong Chu Hydro Electric Power Plant 96 MW– Arunachal Pradesh - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

Sew Nyukcharong Chu Power Corporation Pvt. Ltd (SNCPCL), a subsidiary of SEW Infrastructure Ltd (SEW), is planning to undertake the construction of Nyukcharong Chu Hydro Electric Power Plant project on Nyukcharong Chu River in Arunachal Pradesh, India.

The project involves the construction of a 96MW run of the river hydroelectric power plant on a 25ha of land. It comprises three units of 27MW.

The project includes the construction of an underground powerhouse, switchyard, a 22m high barrage intake structure, a 1,271m head race tunnel of 4.8m diameter, a tail race tunnel of 5.5m diameter, a surge shaft of 62m high 7.0m diameter, a pressure shaft of 3.7m diameter, and other associated infrastructure facilities; the installation of turbines, generators and safety systems; the laying of transmission lines.

On February 23, 2010, Ministry of Environment & Forests (MOEF) had accorded the TOR for detailed EIA study and pre construction clearance and primary and secondary data for the preparation of the EIA report has been collected.

In September 2012, the flora fauna data and river water quality data have been reaffirmed with fresh data collected.

In September 2013, Socio Economic survey and public consultation were conducted. SMEC was appointed to undertake the Social impact assessment (SIA) works on the project.

A meeting was held on July 20, 2015 and July 21, 2015 regarding the consideration of Project Proposals for Scoping and Environment Clearance.

Scope

The project involves the construction of a 96MW power plant on a 25ha of land in the Nyukcharong Chu River in Tawang, Arunachal Pradesh, India.

The US$81 million project includes the following:

1. Construction of an underground powerhouse

2. Construction of switchyard

3. Construction of a 22m high barrage intake structure

4. Construction of a 1,271m head race tunnel of 4.8m diameter

5. Construction of a tail race tunnel of 5.5m diameter

6. Construction of a 62m high surge shaft of 7.0m diameter

7. Construction of a pressure shaft of 3.7m diameter

8. Construction of other related infrastructure facilities

9. Installation of turbines and generators

10. Installation of electrical and safety systems

11. Laying of transmission lines

Reasons To Buy

  • Gain insight into the project.
  • Monitor the latest project developments.
  • Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook

Share this report