SBPI – Rupin Hydroelectric Power Plant 45 MW – Himachal Pradesh - Project Profile

SBPI – Rupin Hydroelectric Power Plant 45 MW – Himachal Pradesh - Project Profile

Synopsis

"SBPI – Rupin Hydroelectric Power Plant 45 MW – Himachal Pradesh - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "SBPI – Rupin Hydroelectric Power Plant 45 MW – Himachal Pradesh - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

Shri Bajrang Power & Ispat Ltd (SBPI) is planning to build a hydroelectric power plant in Shimla, Himachal Pradesh, India.

The project involves the construction of a 45MW hydroelectric power plant on 27ha of land, a surge bay, a penstock, a weir, a powerhouse, a tailrace channel, a switchyard, a spillway, intake structures, access roads , the installation of turbines and pumps, and the laying of transmission lines.

On August 21, 2010, Expert Appraisal Committee (EAC) recommended clearance for pre-construction activities and approved the proposed term of reference (TOR) with some additional TORs.

On September 13, 2010, Ministry of Environment Forest and Climate Change (MoEF &CC) granted TOR to the project and the two years validity period ended on September 13, 2012.

On September 12, 2011, The Directorate of Energy granted techno-economic clearance to the project.

In December 2011, Asian Consulting Engineers Pvt Ltd (ACE) prepared Draft EIA report on behalf of SBPI.

In October 2012, R S Envirolink Technologies Pvt Ltd (RSET) prepared Minimum Environmental Ecological Flow Study Final Report on behalf of SBPI and submitted to MoEF &CC.

On June 27, 2013, SBPI conducted a public hearing on Environmental Impact Assessment (EIA) and Environment Management Plan (EMP) reports within the validity period of the TOR.

The project is awaiting final environmental clearance (EC).

Scope

The project involves the construction of a 45MW hydroelectric power plant on 27ha of land in Shimla, Himachal Pradesh, India.

The US$80 million project includes the following:

1. Construction of a surge bay

2. Construction of a penstock

3. Construction of a high weir

4. Construction of a powerhouse

5. Construction of a tailrace channel

6. Construction of a switch yard

7. Construction of a spillway

8. Construction of intake structures

9. Construction of access roads

10. Installation of turbines and pumps

11. Laying of transmission lines

12. Construction of related infrastructureReasons To Buy

  • Gain insight into the project.
  • Monitor the latest project developments.
  • Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.Appendix

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook

Share this report