Market Research Logo

Rail Infrastructure (Construction) in Indonesia: Market Analytics by Category & Cost Type to 2022

Rail Infrastructure (Construction) in Indonesia: Market Analytics by Category & Cost Type to 2022

Synopsis

Timetric’s "Rail Infrastructure (Construction) in Indonesia: Market Analytics by Category & Cost Type to 2022" contains historic and forecast market data for the rail infrastructure category in Indonesia, it also provides detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services).

Summary

The construction of facilities that serve the railway system is categorized under the rail infrastructure category. It includes, but is not limited to, rail bridges, railway stations, terminals, rail buildings, rail tunnels and rail tracks.

The Indonesian rail infrastructure construction category continued to increase in the review period with a value of IDRxxx.xx million (US$xxx.xx million) in 2017 and increased at a rate of xx.xx% over 2016. The market recorded a CAGR of xx.xx% from 2013 through 2017."Rail Infrastructure (Construction) in Indonesia: Market Analytics by Category & Cost Type to 2022"' provides a top-level overview and detailed insight into the operating environment of the rail infrastructure market in Indonesia. It is an essential tool for companies active across the Indonesia construction value chain and for new players considering to enter the market.

Scope

  • A top level overview of the rail infrastructure construction category in Indonesia.
  • Historic data provided from 2013 through 2017 and forecast from 2018 through 2022.
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment & construction services) across the rail infrastructure market.
Reasons To Buy
  • Provides a top level understanding of the Rail Infrastructure construction in Indonesia.
  • Helps you understand the market performance by construction activity (new construction, repair and maintenance, refurbishment and demolition) and construction cost type (construction materials, construction equipment & construction services).
  • Allows you to plan future business decisions using the forecast figures given.
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.


1 Introduction
1.1 What is this Report About?
1.2 Definitions
1.3 CAGR Definition and Calculation
2 Overall Rail Infrastructure construction: Market Analysis
2.1 Overall Rail Infrastructure construction Output Value, 2013 - 2017
2.2 Overall Rail Infrastructure construction Output Value Forecast, 2018 - 2022
2.3 Overall Rail Infrastructure construction Output, by Cost Type
2.3.1 Overall Rail Infrastructure construction Output, by Cost Type, 2013 - 2017
2.3.2 Overall Rail Infrastructure construction Output Forecast, by Cost Type, 2018 - 2022
3 Rail Infrastructure construction Output: Analysis by Category
3.1 New Construction Output Value, 2013 - 2017
3.2 New Construction Output Value Forecast, 2018 - 2022
3.3 New Construction Output Value by Cost Type
3.3.1 New Construction Output, by Cost type, 2013 - 2017
3.3.2 New Construction Output Forecast, by Cost Type, 2018 - 2022
3.4 Repair & Maintenance Output Value, 2013 - 2017
3.5 Repair & Maintenance Output value Forecast, 2018 - 2022
3.6 Repair & Maintenance Output, by Cost Type
3.6.1 Repair & Maintenance Output, by Cost type, 2013 - 2017
3.6.2 Repair & Maintenance Output Forecast, by Cost Type, 2018 - 2022
3.7 Refurbishment Construction Output Value, 2013 - 2017
3.8 Refurbishment Construction Output Value Forecast, 2018 - 2022
3.9 Refurbishment Construction Output, by Cost Type
3.9.1 Refurbishment Construction Output, by Cost type, 2013 - 2017
3.9.2 Refurbishment Construction Output Forecast, by Cost type, 2018 - 2022
3.1 Demolition Construction Output Value, 2013 - 2017
3.11 Demolition Construction Output Value Forecast, 2018 - 2022
3.12 Demolition Construction Output, by Cost Type
3.12.1 Demolition Construction Output, by Cost type, 2013 - 2017
3.12.2 Demolition Construction Output Forecast, by Cost type, 2018 - 2022
4 Appendix
4.1 Summary Methodology
4.2 Exchange Rates
4.3 About Timetric
4.4 Timetric’s Services
4.5 Disclaimer
List of Tables
Table 1: Timetric- Rail Infrastructure construction Market Definitions
Table 2: Indonesian Overall Rail Infrastructure construction Output Value (US$ Million), 2013 - 2017
Table 3: Indonesian Overall Rail Infrastructure construction Output Value (IDR Million), 2013 - 2017
Table 4: Indonesian Overall Rail Infrastructure construction Output Value (US$ Million), 2018 - 2022
Table 5: Indonesian Overall Rail Infrastructure construction Output Value (IDR Million), 2018 - 2022
Table 6: Indonesian Overall Rail Infrastructure construction Output, by Cost Type (US$ Million), 2013 - 2017
Table 7: Indonesian Overall Rail Infrastructure construction Output, by Cost Type (IDR Million), 2013 - 2017
Table 8: Indonesian Overall Rail Infrastructure construction Output, by Cost Type (US$ Million), 2018 - 2022
Table 9: Indonesian Overall Rail Infrastructure construction Output, by Cost Type (IDR Million), 2018 - 2022
Table 10: Indonesian Rail Infrastructure construction Output Value, New Construction (US$ Million), 2013 - 2017
Table 11: Indonesian Rail Infrastructure construction Output Value, New Construction (IDR Million), 2013 - 2017
Table 12: Indonesian Rail Infrastructure construction Output Value, New Construction (US$ Million), 2018 - 2022
Table 13: Indonesian Rail Infrastructure construction Output Value, New Construction (IDR Million), 2018 - 2022
Table 14: Indonesian Rail Infrastructure construction Output, New Construction by Cost Type (US$ Million), 2013 - 2017
Table 15: Indonesian Rail Infrastructure construction Output, New Construction by Cost Type (IDR Million), 2013 - 2017
Table 16: Indonesian Rail Infrastructure construction Output, New Construction by Cost Type (US$ Million), 2018 - 2022
Table 17: Indonesian Rail Infrastructure construction Output, New Construction by Cost Type (IDR Million), 2018 - 2022
Table 18: Indonesian Rail Infrastructure construction Output Value, Repair & Maintenance (US$ Million), 2013 - 2017
Table 19: Indonesian Rail Infrastructure construction Output Value, Repair & Maintenance (IDR Million), 2013 - 2017
Table 20: Indonesian Rail Infrastructure construction Output Value, Repair & Maintenance (US$ Million), 2018 - 2022
Table 21: Indonesian Rail Infrastructure construction Output Value, Repair & Maintenance (IDR Million), 2018 - 2022
Table 22: Indonesian Rail Infrastructure construction Output, Repair & Maintenance by Cost Type(US$ Million), 2013 - 2017
Table 23: Indonesian Rail Infrastructure construction Output, Repair & Maintenance by Cost Type (IDR Million), 2013 - 2017
Table 24: Indonesian Rail Infrastructure construction Output, Repair & Maintenance by Cost Type (US$ Million), 2018 - 2022
Table 25: Indonesian Rail Infrastructure construction Output, Repair & Maintenance by Cost Type (IDR Million), 2018 - 2022
Table 26: Indonesian Rail Infrastructure construction Output Value, Refurbishment (US$ Million), 2013 - 2017
Table 27: Indonesian Rail Infrastructure construction Output Value, Refurbishment (IDR Million), 2013 - 2017
Table 28: Indonesian Rail Infrastructure construction Output Value, Refurbishment (US$ Million), 2018 - 2022
Table 29: Indonesian Rail Infrastructure construction Output Value, Refurbishment (IDR Million), 2018 - 2022
Table 30: Indonesian Rail Infrastructure construction Output, Refurbishment by Cost Type (US$ Million), 2013 - 2017
Table 31: Indonesian Rail Infrastructure construction Output, Refurbishment by Cost Type (IDR Million), 2013 - 2017
Table 32: Indonesian Rail Infrastructure construction Output, Refurbishment by Cost Type (US$ Million), 2018 - 2022
Table 33: Indonesian Rail Infrastructure construction Output, Refurbishment by Cost Type (IDR Million), 2018 - 2022
Table 34: Indonesian Rail Infrastructure construction Output Value, Demolition (US$ Million), 2013 - 2017
Table 35: Indonesian Rail Infrastructure construction Output Value, Demolition (IDR Million), 2013 - 2017
Table 36: Indonesian Rail Infrastructure construction Output Value, Demolition (US$ Million), 2018 - 2022
Table 37: Indonesian Rail Infrastructure construction Output Value, Demolition (IDR Million), 2018 - 2022
Table 38: Indonesian Rail Infrastructure construction Output, Demolition by Cost Type (US$ Million), 2013 - 2017
Table 39: Indonesian Rail Infrastructure construction Output, Demolition by Cost Type (IDR Million), 2013 - 2017
Table 40: Indonesian Rail Infrastructure construction Output, Demolition by Cost Type (US$ Million), 2018 - 2022
Table 41: Indonesian Rail Infrastructure construction Output, Demolition by Cost Type (IDR Million), 2018 - 2022
Table 42: Exchange Rate (Annual Average), 2013 – 2017
Table 43: Exchange Rate (Annual Average), 2018 – 2022 Forecast
List of Figures
Figure 1: Indonesian Overall Rail Infrastructure construction Output Value (IDR Million), 2013 - 2017
Figure 2: Indonesian Overall Rail Infrastructure construction Output Value (IDR Million), 2018 - 2022
Figure 3: Indonesian Overall Rail Infrastructure construction Output, by Cost Type (IDR Million), 2013 - 2017
Figure 4: Indonesian Overall Rail Infrastructure construction Output, by Cost Type (IDR Million), 2018 - 2022
Figure 5: Indonesian Rail Infrastructure construction Output Value, New Construction (IDR Million), 2013 - 2017
Figure 6: Indonesian Rail Infrastructure construction Output Value, New Construction (IDR Million), 2018 - 2022
Figure 7: Indonesian Rail Infrastructure construction Output, New Construction by Cost Type (IDR Million), 2013 - 2017
Figure 8: Indonesian Rail Infrastructure construction Output, New Construction by Cost Type (IDR Million), 2018 - 2022
Figure 9: Indonesian Rail Infrastructure construction Output Value, Repair & Maintenance (IDR Million), 2013 - 2017
Figure 10: Indonesian Rail Infrastructure construction Output Value, Repair & Maintenance (IDR Million), 2018 - 2022
Figure 11: Indonesian Rail Infrastructure construction Output, Repair & Maintenance by Cost Type (IDR Million), 2013 - 2017
Figure 12: Indonesian Rail Infrastructure construction Output, Repair & Maintenance by Cost Type (IDR Million), 2018 - 2022
Figure 13: Indonesian Rail Infrastructure construction Output Value, Refurbishment (IDR Million), 2013 - 2017
Figure 14: Indonesian Rail Infrastructure construction Output Value, Refurbishment (IDR Million), 2018 - 2022
Figure 15: Indonesian Rail Infrastructure construction Output, Refurbishment by Cost Type (IDR Million), 2013 - 2017
Figure 16: Indonesian Rail Infrastructure construction Output, Refurbishment by Cost Type (IDR Million), 2018 - 2022
Figure 17: Indonesian Rail Infrastructure construction Output Value, Demolition (IDR Million), 2013 - 2017
Figure 18: Indonesian Rail Infrastructure construction Output Value, Demolition (IDR Million), 2018 - 2022
Figure 19: Indonesian Rail Infrastructure construction Output, Demolition by Cost Type (IDR Million), 2013 - 2017
Figure 20: Indonesian Rail Infrastructure construction Output, Demolition by Cost Type (IDR Million), 2018 - 2022

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook

Share this report