LBDA – Magwagwa Multipurpose Dam Development – Kenya - Project Profile

LBDA – Magwagwa Multipurpose Dam Development – Kenya - Project Profile

Synopsis

"LBDA – Magwagwa Multipurpose Dam Development – Kenya - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "LBDA – Magwagwa Multipurpose Dam Development – Kenya - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

The Lake Basin Development Authority (LBDA) is planning to undertake the construction of a dam in Magwagwa, Nyanza Province, Kenya.

The project involves the construction of a 95m-high and 450m-long concrete-faced rockfill dam with a capacity to generate 120 MW of hydropower.

The project includes the construction of a barrage, a reservoir of 17.7km2 with an active storage of 445 million m3, a substation, a powerhouse with three 40MW generation units, access roads, pump stations, an 11km head race tunnel, upstream surge shaft, downstream surge chamber and a 6 km long tailrace tunnel, and the installation of spillway, safety and security systems, and the laying of transmission lines.

The net command area for irrigation is 13,807ha. Phase 1 of the irrigation scheme development comprises the construction of 16 km long concrete lined main canal from Sondu-Miriu Powerhouse to the right bank of the Asawo river, secondary and tertiary canals, regulation structures and appurtenant works to cover 3,063ha.

In 2011, SMEC International Pty Ltd conducted the feasibility study on detail design and social and environmental impact assessments (DSEIA) on the project.

Rock Link Gealogical consultants has been appointed to undertake Geo-technical investigation.

On August 26, 2016, LBDA issued an expression of interest (EOI) for engineering, procurement and construction (EPC) and financing of the project with a submission deadline of October 6, 2016.

Pre-tender activities are underway and LBDA is in the process of awarding contract for Transaction Advisory (TA) Services.

Scope

The Magwagwa Multipurpose Dam project involves the construction of a 95m high and 450m long concrete faced rockfill dam will generate 120 MW of hydropower in Magwagwa, Nyanza Province, Kenya.

The US$800 million project includes the following:

1. Construction of a barrage

2. Construction of a reservoir of 17.7km2 with an active storage of 445 million m3

3. Construction of a substation

4. Construction of a powerhouse with 40MW three generation units

5. Construction of access roads

6. Construction of pump stations

7. Construction of an 11km head race tunnel

8. Construction of upstream surge shaft

9. Construction of downstream surge chamber

10. Construction of a 6 km long tailrace tunnel

11. Installation of spillway, safety and security systems

12. Laying of transmission linesReasons To Buy

  • Gain insight into the project.
  • Monitor the latest project developments.
  • Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.Appendix

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook

Share this report