Market Research Logo

HPPCL – Sainj Hydroelectric Power Plant 100 MW – Himachal Pradesh - Project Profile

HPPCL – Sainj Hydroelectric Power Plant 100 MW – Himachal Pradesh - Project Profile

Synopsis

"HPPCL – Sainj Hydroelectric Power Plant 100 MW – Himachal Pradesh - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "HPPCL – Sainj Hydroelectric Power Plant 100 MW – Himachal Pradesh - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

Himachal Pradesh Power Corporation Ltd (HPPCL) is undertaking the construction of a Sainj Hydroelectric power Plant project in Himachal Pradesh, India.

The project involves the construction of a 100MW hydroelectric power plant. It developed in two units of 50MW each.

It includes the construction of a diversion barrage, a powerhouse, a substation, access roads, a headrace tunnel, two underground desilting tanks, a 4.8m D-shaped tailrace tunnel and other related facilities, and the installation of two, 50MW vertical-axis Pelton turbines, transformers, generators, and the laying of transmission lines.

Startech Labs Pvt Ltd has been appointed as a quality surveyor, Strategic Consulting Group as the consultant for the project.

In June 2010, Hindustan Construction Company Ltd (HCC) was appointed as the EPC contractor for the project. The scope of the contract includes planning, design, engineering and execution of civil and infrastructure works of the project.

In January 2011, the project received funding from the Asian Development Bank.

In January 2015, HPPCL received Genentech Environment Award 2015 for environment management of the project.

In June 2017, construction activities on the first unit were completed and the second unit is underway.

Scope

The project involves the construction of a 100MW hydroelectric power plant near Suind on river Sainj in Kullu, Himachal Pradesh, India.

The US$131 million project includes the following:

1. Construction of a diversion barrage

2. Construction of a powerhouse

3. Construction of a substation

4. Construction of access roads

5. Construction of a headrace tunnel

6. Construction of two underground desilting tanks

7. Construction of a 4.8m D-shaped tailrace tunnel

8. Laying of transmission lines

9. Installation of two 50MW vertical-axis pelton turbines

10. Installation of generators

11. Installation of transformersReasons To Buy

  • Gain insight into the project.
  • Monitor the latest project developments.
  • Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook

Share this report