HEP – Mbongozi Hydroelectric Power Plant 41 MW – Malawi - Project Profile

HEP – Mbongozi Hydroelectric Power Plant 41 MW – Malawi - Project Profile

Synopsis

"HEP – Mbongozi Hydroelectric Power Plant 41 MW – Malawi - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "HEP – Mbongozi Hydroelectric Power Plant 41 MW – Malawi - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

HE Power Ltd (HEP) is planning to construct a hydroelectric power plant on the Bua River in Nkhota-kota District, Central Region.

The project includes the construction of two hydro power plants with combined power generation of 41MW (1x16MW, 1x25MW). It includes the construction of two Earth dams; one at Mphindapasi on Bua River and Chimbwazi on Chimbwazi River, a tributary of Bua (on the downstream) and connected with a canal/tunnel, a powerhouse, a substation, spillways, reservoirs, turbine bases, a control unit, a switch yard and an admin office, the installation of generators, turbines and transformers, and the laying of transmission lines.

Scope

The project includes the construction of two hydro power plants with combined power generation of 41MW in the Central Region of Malawi.

The US$198 million project includes the following:

1. Construction of two Earth dams

2. Construction of a substation

3. Construction of spillways

4. Construction of reservoirs

5. Construction of a powerhouse

6. Construction of a control unit

7. Construction of switch yards

8. Construction of office spaces

9. Installation of generators

10. Installation of turbines

11. Installation of transformers

12. Laying of transmission lines

Reasons To Buy

  • Gain insight into the project.
  • Monitor the latest project developments.
  • Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix