FP/CNPC/Petropars – South Pars Gas Field: Phase XI – Bushehr Province - Project Profile

FP/CNPC/Petropars – South Pars Gas Field: Phase XI – Bushehr Province - Project Profile

Synopsis

"FP/CNPC/Petropars – South Pars Gas Field: Phase XI – Bushehr Province - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "FP/CNPC/Petropars – South Pars Gas Field: Phase XI – Bushehr Province - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

Total S.A. (FP), Petropars Ltd (Petropars), a subsidiary of National Iranian Oil Company (NIOC) and China National Petroleum Corporation (CNPC) are planning to undertake the development of eleventh phase of the South Pars gas field in Bushehr Province, Iran.

The project involves the development of gas field with a gas production capacity of 56.6 million cubic meters per day (mcm/d), the extraction of 53.8 mcm/d sour gas to feed LNG Plant and the production of 80,000 barrels per day (bbl/d) of heavy gas condensates. It will be developed in two phases namely Phase 11A and Phase 11B.

Phase 11A includes the drilling of 12 wells for the gas production of 28.3 mcm/d, construction of a 32-inch, 136km-long sea line. Once operational. The gas produced from Phase 11A will be transferred to Phase 12 refinery.

Phase 11B includes the drilling of 12 wells for the gas production of 28.3 mcm/d, construction of a 32-inch, 136km-long sea line. Once operational. the gas produced from Phase 11A will be transferred to Phase 8 refinery.

The project also includes the construction of a steel jacket, an offshore platform, a three-phase test separator for testing the wells, two three-phase separators for water separation, a water treatment unit, two 4.5-inch sea lines for transferring glycol solution to the offshore platforms, a 36-inch gas condensate transfer pipeline, a 4.5km-long Single Buoy Mooring (SBM) to load and export the produced condensates, a gas condensate storage unit, a mono ethylene glycol regeneration unit, a firefighting water system, control rooms, electricity substations, a laboratory, a warehouse, a workshop, offices.

In November 2016, FP, CNPC and Petropars signed a Heads of Agreement (HOA) with NIOC for the project development.

In July 2017, FP, CNPC and Petropars signed a 20-year agreement with Ministry of Petroleum, Iran for the development and production of the project.

FP, CNPC and Petropars are in the process of issuing tenders for the project and the contracts are expected to be awarded by the fourth quarter of 2017. Construction work is expected to be completed by 2021.

Scope

The project involves the development of gas field with a gas production capacity of 56.6 million cubic meter per day (mcm/d), the extraction of 53.8 mcm/d sour gas to feed LNG Plant and the production of 80,000 barrels per day (bbl/d) of heavy gas condensates in Asaluyeh, Bushehr Province, Iran.

The US$4,800 million project includes the following:

1. Drilling of 24 wells under Phase 11A and 11B

2. Construction of two 32-inch, 136km-long sea lines

3. Construction of a steel jacket

4. Construction of an offshore platform

5. Construction of a three-phase test separator for testing the wells

6. Construction of two three-phase separators for water separation

7. Construction of a water treatment unit

8. Construction of two 4.5-inch sea lines for transferring glycol solution to the offshore platforms

9. Construction of a 36-inch gas condensate transfer pipeline

10. Construction of a 4.5km-long SBM

11. Construction of a gas condensate storage unit

12. Construction of a mono ethylene glycol regeneration unit

13. Construction of a fire fighting water system

14. Construction of control rooms

15. Construction of electricity substations

16. Construction of a laboratory

17. Construction of a warehouse

18. Construction of a workshop

19. Construction of offices

20. Laying of submarine pipelinesReasons To Buy

  • Gain insight into the project.
  • Monitor the latest project developments.
  • Identify key project contacts.


1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix