Market Research Logo

BGI – Biliran Geothermal Power Plant 50 MW – Eastern Visayas - Project Profile

1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Scope
6.Description
7.Latest update
8.Background
9.Key Contacts
10.General News, Project News
11.Appendix

BGI – Biliran Geothermal Power Plant 50 MW – Eastern Visayas - Project Profile

Synopsis

"BGI – Biliran Geothermal Power Plant 50 MW – Eastern Visayas - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "BGI – Biliran Geothermal Power Plant 50 MW – Eastern Visayas - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

Biliran Geothermal Inc (BGI) is undertaking the construction of a geothermal power plant in Eastern Visayas, Philippines.

The project involves the construction of a 50MW geothermal power plant and will be implemented in two phases under multiple units. Phase I involves the construction of 10MW with the installation of 13.2 KV line and the second phase involves the construction of 39MW with the installation of 69KV line.

It also includes the construction of a powerhouse, a substation, access roads the installation of generators and transformers, and the laying of transmission lines.

Resource Development Consultants Ltd has been appointed as the geotechnical consultant, the scope of work involves the surface-based geophysical survey comprising; seismic refraction tomography (SRT) to measure compressional wave velocity; MASW to measure shear wave velocity; Vertical electrical sounding to measure apparent resistivity; Laboratory testing from test pits and boreholes; Site walkover and geological mapping to confirm investigation locations and identify geo-hazards; supervision of 7 triple tubed boreholes; engineering geological logging of recovered materials on 24hr shifts; test pits investigations across site to understand near surface materials and suitability for shallow foundations, identify FILL material if required.

Mannvit Engineering has been appointed as the lead consultant the scope of work covers design review, steam gathering system, and initial power plant design, Project Management, Resident Engineer, and supervision.

Orka Energy provides the Section Engineer for civil works, GHD Pty Ltd has been appointed as the engineering consultant which provides civil works design and supervision.

BGI secured an environmental compliance certificate for exploration drilling and the power plant on December 6, 2012 and August 23, 2013, respectively.

On August 22, 2013, Biliran Geothermal Inc. signed an agreement with Icelandic Drilling Co. to conduct exploratory drilling on the site.

BGI is in the process of signing power supply agreements (PSA) and upon completion of PSA, main construction works will commence. The first two units, each of 5MW, are expected to complete by September 2018 and March 2019 respectively. The rest are scheduled to be completed between July 2021 and July 2023.

Scope

The project involves the construction of a 50MW geothermal power plant in Biliran, Eastern Visayas, the Philippines.

The US$208 million project includes the following:

1. Construction of a powerhouse

2. Construction of a substation

3. Construction of water cooling units

4. Construction of access roads

5. Installation of generators

6. Installation of transformers

7. Laying of transmission lines

Reasons To Buy

  • Gain insight into the project.
  • Monitor the latest project developments.
  • Identify key project contacts.


Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook

Share this report

;