Ghana Power Report Q2 2016

Ghana Power Report Q2 2016

BMI View: Current low rainfall levels and gas supply irregularities result in Ghana having a subduedpower generation forecast for 2016. Increased investment into diversifying the power sector and theresignation of the Minister of Power show the Ghanaian government's firm commitment to solving thepower crisis, with strong potential for growth present should rainfall increase and gas supply improve.

Latest Updates And Structural Trends

A Turkish power ship is currently in the port of Tema, connected to the grid and supplying 225megawatts (MW) of electricity to Ghana. The ship is contracted to remain there for 10 years to help withthe electricity shortage. The Ayşegül Sultan is the first of two ships to be dispatched to Ghana as atemporary power solution, with the second ship due to arrive later in 2016.

The Atuabo gas processing plant was shut down for two weeks in January 2016 to undergo maintenance.

A loss of 600MW in generating capacity was forecast, although the Ministry of Power has stated that theVolta River Authority (VRA) had sufficient gas reserves to mitigate the effects of the plant goingoffline.

The decline in hydropower generation has been singled out by the IMF's Mission Chief for Ghana as oneof the main factors for the need to increase electricity tariffs in Ghana, as developing other forms ofpower generation is essentially more expensive.


BMI Industry View
Table: Headline Power Forecasts (Ghana 2015
2021)
SWOT
Industry Forecast
Ghana Snapshot
Table: Country Snapshot: Economic And Demographic Data (Ghana 2015
2019)
Table: Country Snapshot: Economic and Demographic Data (Ghana 2020
2025)
Table: Country Snapshot: Power Sector
Ghana Power Forecast Scenario
Electricity Generation And Power Generating Capacity
Hydropower Generation And Capacity Forecast
Renewables Generation And Capacity Forecast
Table: Total Electricity Generation Data And Forecasts (Ghana 2014
2019)
Table: Total Electricity Generation Data And Forecasts (Ghana 2020
2025)
Table: Electricity Generating Capacity Data And Forecasts (Ghana 2014
2019)
Table: Electricity Generating Capacity Data And Forecasts (Ghana 2020
2025)
Electricity Consumption
Table: Total Electricity Consumption Data And Forecasts (Ghana 2014
2019)
Table: Total Electricity Consumption Data And Forecasts (Ghana 2020
2025)
Transmission And Distribution, Imports & Exports
Table: Electric Power T&D Losses Data And Forecasts (Ghana 2014
2019)
Table: Electric Power T&D Losses Data And Forecasts (Ghana 2020
2025)
Table: Trade Data And Forecasts (Ghana 2014
2019)
Table: Trade Data And Forecasts (Ghana 2020
2025)
Industry Risk Reward Ratings
Africa Power Risk/Reward Index
Table: SSA Power RRI (Scores Out Of 100)
Ghana Power Risk/Reward Index
Rewards
Risks
Market Overview
Key Policies And Market Structure
Regulation And Competition
Pricing
SSA Key Policies/Market Structure
Competitive Landscape
Competitive Landscape
Regional Overview
Glossary
Table: Glossary Of Terms
Methodology
Methodology And Sources
Industry Forecast Methodology
Sources
Risk/Reward Index Methodology
Table: Power Risk/Reward Index Indicators
Table: Weighting Of Indicators